Skip to main content
Bus Line Refresh Logo

Existing: Route G2 West Busway

Proposed: Route G1 Carnegie - Downtown via West Busway

Route G2 is proposed to become Route G1. No alignment changes to this route are proposed.

Proposed Route G1

Key Route Improvements

  • G1 service would retain the existing routing and frequency of the existing G2.
  • New connections and transfers would be available at Carnegie Station to access Robinson Town Center and the Airport.
  • Would increase overall frequency at all stations on the West Busway by lifting stop restrictions.

Route Highlights

  • A connection would be available to route D26 at Sheraden Station, which provides access to Sheraden, Elliott, and the West End.
  • All West Busway routes (G1, X28, and D25) would serve all stops in both directions, which would increase overall service frequency and make riding the Busway easier to understand.
  • A transfer would be available at any West Busway Station to the D25 to Robinson Town Center or to the X28 to the Airport.
  • A connection would be available to the D26 and D27 at Ingram Station and to the D29 connection at Crafton Station.
  • No alignment changes to this route would be proposed.

Summary of Hours

Weekdays
  • 5 AM - 6 AM
    • Service every 40 min
  • 6 AM - 9 AM
    • Service every 20 min
  • 9 AM - 3 PM
    • Service every 40 min
  • 3 PM - 6 PM
    • Service every 20 min
  • 6 PM - 8 PM
    • Service every 40 min
  • 8 PM - 11 PM
    • Service every 60 min

Saturdays

  • 5 AM - 8 PM
    • Service every 40 min
  • 8 PM - 10 PM
    • Service every 60 min

Sundays

  • 6 AM - 8 PM
    • Service every 40 min
  • 8 PM - 9 PM
    • Service every 60 min

Contact Us

345 Sixth Ave, 3rd Floor, Pittsburgh, PA 15222

412-566-5500

Email engage@rideprt.org

Social Media